skip to main | skip to sidebar

Formworks - Fall 2012

Tuesday, September 4, 2012

Introducing Formworks




































































Posted by Josh Draper at 1:25 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Course Info

  • Class Brief
  • Class Schedule
  • Introducing Formworks
  • Previous Formworks Blogs

Lectures

  • Dynamic Formworks

Assignments

  • Assignment 1: Ornament in 2.5 D
  • Assignment 2: Modular Games
  • Assignment 3: System on Site
  • Final Requirements

Resources

  • Smooth-On - mold materials
  • Materials Index
  • 2 part mold - extract parting seam
  • 2 part mold - thin panel
  • Hercules retaining wall modules
  • National Concrete Masonry Assc.
  • Architectural Precast Assc.
  • Cast Stone Institute
  • Interlocking Concrete Pavement Institute

Scripts

  • Sculpt Brick Array
  • Organized Noise
  • Wandering Wall
  • Extract Isocurves
  • Array Points on Surface

Formats: Blog and Final

Formats: Blog and Final

Blog Archive

  • ▼  2012 (64)
    • ▼  December (12)
      • Final_Alfonso.Amir.Matt.Peggy - Concerto in W Minor
      • Final Presentation _ Claire(Can), Emily, Melissa
      • Final Presentation_Yiqing&Ruomei
      • "Trash Cast" (oln2101, jm3857, ase2119)
      • Land[dr]ape installed
      • LAND[DR]APE FINAL
      • Final Presentation Yikum/Hugo
      • Final Presentation_Claire(Can), Melissa, Emily
      • Final Presentation: Zemouli/Hoffman/Wang
      • lan(Drape) final form progress
      • Lan(Drape)-Anna, Rand, Karl- Final Progress
      • Assignment02-progress3-Yiqing&Ruomei
    • ►  November (35)
    • ►  October (15)
    • ►  September (1)
    • ►  August (1)

Total Pageviews

Powered by Blogger.