skip to main | skip to sidebar

Formworks - Fall 2012

Thursday, August 30, 2012

Previous Formworks Blogs

Formworks Spring 2012

Formworks Fall 2011

Formworks Spring 2011


Formworks Spring 2010

Formworks Fall 2009

Formworks Spring 2009

Formworks Fall 2008

Formworks Summer 2008

Posted by Josh Draper at 2:30 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Home
Subscribe to: Posts (Atom)

Course Info

  • Class Brief
  • Class Schedule
  • Introducing Formworks
  • Previous Formworks Blogs

Lectures

  • Dynamic Formworks

Assignments

  • Assignment 1: Ornament in 2.5 D
  • Assignment 2: Modular Games
  • Assignment 3: System on Site
  • Final Requirements

Resources

  • Smooth-On - mold materials
  • Materials Index
  • 2 part mold - extract parting seam
  • 2 part mold - thin panel
  • Hercules retaining wall modules
  • National Concrete Masonry Assc.
  • Architectural Precast Assc.
  • Cast Stone Institute
  • Interlocking Concrete Pavement Institute

Scripts

  • Sculpt Brick Array
  • Organized Noise
  • Wandering Wall
  • Extract Isocurves
  • Array Points on Surface

Formats: Blog and Final

Formats: Blog and Final

Blog Archive

  • ▼  2012 (64)
    • ►  December (12)
    • ►  November (35)
    • ►  October (15)
    • ►  September (1)
    • ▼  August (1)
      • Previous Formworks Blogs

Total Pageviews

Powered by Blogger.