Sunday, November 11, 2012

Assignment 02 - Progress - Rand, Anna, Karl


Volume Takeoffs - each panel has a volume of 29.114 cu. inches, so 116.456 cu. inches of hydrocal will be required for the cast.

Rhino files - top and bottom panels with with registration surfaces added.

RhinoCAM - milling operations.

Ready for casting.

No comments:

Post a Comment